Foundry formed coke
Foundry formed coke
GOAL foundry formed coke considered as a new type of coke is made from coal powder and other briquettes, and then carbonized. It is a kind of coke with uniform shape produced by pressure forming method, ie, coke made from briquetted lump or spherical processing coal for metallurgy.
Video
Industry-specific Attributes
Other Attributes
Place of Origin | Shanxi, China |
Brand Name | GOAL |
Model Number | DMF-8,10,12,13 |
Application | Casting/ Metallurgical Industry |
Shape | Cylinder/Cube |
Abrasive Resistance | M10<7% |
Crushing Strength | M40>88% |
Feature | Small porosity, low ash low sulphur, low phosphorus, high crushing strength |
Certificate | ISO9001 |
Package | 1MT Jumbo Bag/ Loose inside Container |
MOQ | 20 Tons |
Supply Ability | 5000 Metric Ton/Metric Tons per Month |
Lead Time
Quantity (tons) | 1 - 20 | 21 - 100 | 101 - 500 | > 500 |
Lead time (days) | 5 | 7 | 13 | To be negotiated |
Application
1.Iron casting, Steel making
2.Clay bricks factory, chemical industry.
3.Cement plants, Power plants
4.Refractory and coal gasifier plants.
Exhibitions
Advantages
Packing&Shipping
Q1: Are you trading company or manufacturer?
A: We are manufacturer, factory located in NingXia and trading branch in Shanghai.
Q2: What is your advantages?
A: Over 20 years of international trade experience, factory directly supply.
Q3: how can we guarantee quality?
A: Always a pre-production sample before mass production, final Inspection before shipment.
Q4: Need third party inspection before shipping, can you arrange?
A: Sure, we can arrange CCIC or SGS or other third party inspect.
Q5: How can I get the sample?
A: We’d like to offer 20-500g samples for free, costumer only need to afford the freight of express.
Q6: What is your production capacity and delivery date?
A: 5000MT/month. Usually, we will arrange the shipment within 15-20days after down-payment confirmed.
Q7: What is your terms of delivery?
A: FOB, CFR, CIF, EXW, etc
Q8:How about the price?
A: The price on Alibaba is a rough price, actual price will depend on raw materials price, exchange rate, and your order size.
Q9: How about the payment.
A: 30% down-payment and 70% before shipment, irrevocable L/C, Cash and so on.